Clamp system applications
Mounting system to the construction of the system, giving the name of this system; aesthetic, long-lasting and guaranteed to provide the coating system.
The trapezes, which are mounted without puncturing the surface, are clamped together with the help of an electric robot. This process ensures impermeability of the coating. The clamp units in the clamp zones consist of fixed and movable elements. Thanks to the L-clip mounted on the construction and the movable clip that moves in the oval cavity, the thermal expansions of the tall trapezes are absorbed. In the installation of short trapezes, only the use of fixed clips is sufficient.
The clamp system trapezes are mounted with special clips. It is not possible to see these clips after mounting. The trapezium surface is not punctured by the use of these clips which are hidden in the region of the cushion.
Clamp System Features and Performances
Impermeability strong>: There is no risk of leakage because there are no screw holes on the surface.
The clamping of the clamp area makes it impermeable even if all of these areas are covered by snow.
It provides full protection against leakage on the roofs and facades such as skylight and windows.
Clip-clamp connection details; It is designed to provide full resistance to the suction force in high wind forces.
Efficiency strong>: Durable and suitable for all types of coating systems. No maintenance required. It is possible to use recycling. Reviews
Long life span strong>: Painted sheet offers a stainless steel guarantee. Properly proportional to the life of the building and the type of paint suitable for all types of environment (plastisol, pvdf, polyester) selection, longevity.
Cost strong>: Investment cost - lifetime is low. It is light but robust, so the construction loads are reduced. This reduces the building cost.
Docking Methods and Site Production strong>: Before full clamping with the use of robots; With the help of hand clamps, the trapezes are clamped as "single clamps" and "double clamps".
The trapezes produced as a single piece in the construction site should be clamped with hand clamps every 1.00 meters during the installation.
This process; The robot allows the clamping to be carried out after the roof surface has been completely covered.